AI Price Estimator · Manitoba 2026
Real prices. Real breakdown. No pressure.
Trained on hundreds of completed Manitoba projects. See exactly where every dollar goes — materials, labour, permits, and the milestone payment schedule we use on every contract.
Configure your project
Get a printable copy & save your estimate
Your estimate is saved with a unique reference number. Our team is alerted instantly and will follow up within 1 business hour.
Where your money goes
Line-item breakdown
Every contract we issue itemizes scope at this level — no vague lump sums.
Structural & demising walls
$50,900–$77,300
16% of project
Mechanical/electrical (Div. 22-26)
$76,300–$115,900
24% of project
Finishes (flooring, paint, ceiling)
$57,250–$86,950
18% of project
Millwork & built-ins
$31,800–$48,300
10% of project
Labour, supervision, safety
$63,600–$96,600
20% of project
Permits, drawings, occupancy
$22,250–$33,800
7% of project
Site protection & cleanup
$15,900–$24,150
5% of project
Payment schedule
Down payment & milestones
You only pay as we hit visible, agreed milestones. No large upfront cash, no balloon final.
- 1
Deposit
15%
On contract signing — secures schedule & material orders
$47,700 – $72,450
- 2
Project start
25%
Day 1 of on-site work — demo & rough-in begin
$79,500 – $120,750
- 3
Mid-project
30%
After rough-ins inspected & drywall complete
$95,400 – $144,900
- 4
Pre-completion
20%
Finishes installed, before final walkthrough
$63,600 – $96,600
- 5
Final on completion
10%
After your sign-off & deficiency list cleared
$31,800 – $48,300
Accepted payment methods
e-Transfer, cheque, direct deposit, Visa & Mastercard. Financing available through our partner lenders (OAC) — ask about 0% intro options for projects over $15,000.
What this estimate includes
Not included (priced separately if needed)
GST/PST, asbestos abatement, structural engineering reports, appliance purchases above the agreed allowance, and unforeseen rot/mould remediation discovered after demo. We'll always quote these in writing before proceeding — never tacked on after.
Common questions
Pricing FAQ
Is this estimate accurate?
It's calibrated against ARA Reno's last 18 months of completed Manitoba projects. The range you see is what 80% of similar jobs land within. After a free site visit, we issue a fixed-price written quote — that price is locked.
Why a range and not one number?
Two identical-sqft kitchens can vary by $20K depending on cabinet brand, countertop material, and electrical scope. The range shows the realistic span; your fixed quote will land at one number.
Do you require a large down payment?
No. Our deposit is 15% on signing — just enough to lock your start date and order long-lead materials. The remaining 85% is paid as we hit visible milestones you can see and verify.
What if costs change mid-project?
They don't, unless you change the scope. Any change order is quoted in writing and signed by you before work proceeds. No surprise invoices, ever.
Do you offer financing?
Yes — through partner lenders (OAC) for projects over $15,000. Ask us about 0% intro promotional rates currently available.
Are permits really included?
Yes. We pull all required City of Winnipeg permits (or your local municipality) and coordinate inspections. The permit fee is built into the estimate base.
Ready for a fixed-price quote?
Book a free 45-minute site visit. We measure, listen, and email a written quote within 48 hours. No deposit, no obligation.